This was my first contract in Austria and it went incredibly
well, especially with a metre of fresh snow to start with. I
had 9 days starting 11th January to prepare FlachauWinkl a
new 22ft pipe. This was not a long time for a pipe build so
everything needed to be well in place and on time, and it
was. These guys were organised and ready for action so it
was game on as soon as I arrived.